TECHNICAL BULLETINS FOR FOUNDATION SYSTEMS
Guides:
- 665C Chockfast Orange Hardener Ratio Guide for Chocking Between Steel & Concrete
- 691D Calculating Pull-Out Strength
- 693C Chockfast Orange Hardener Ratio Guide for Chocking Between Steel & Steel
- 694 Basic Chocking Procedure
- 1024F Guidelines for Storage & Disposal of Chockfast Products
- 1039C How to Read a Batch Number
- 1043C Chockfast Red Versaflow Installation Guide
Installations:
- 641A Surface Preparations Recommendations for Chockfast Epoxy Chocks and Grouts
- 642L Installing Chockfast Grout in Industrial Applications
- 660B Hold Down Bolt Arrangements
- 661F Injecting Resin into Cracks in Concrete
- 662E Installing Expansion Joints
- 695A Epoxy Grout General Installation Steps
- 1600E Epoxy Grout Installation
- 1647D Anchor Bolt & Leveling Screw Installation Detail for All Epoxy Grout Systems
Resources / References:
- 559A Chockfast Red vs. Concrete A Comparison of Physical Properties
- 610Q Grout Comparison
- 615E Large Anchor Bolts
- 619B Chockfast Red Cold Weather Grouting & Special Precautions
- 638D Chockfast Red Compatibility with Concrete
- 639C The Goal Maintain Alignment & How Chockfast Helps Maintain Alignment
- 643E Standard Chock Design for Integral Gas Engine Compressors
- 663B Understanding the Physical Properties of Epoxy Grout
- 667B Design for Operating Temp
- 672B Expansion Joint Compound Estimating Formula & Chart
- 675H Chemical Resistance Chart for Industrial Products
Specifics:
Drawings: